Abu Dhabi Corniche Swimming Beach

Client: Abu Dhabi Municipality (PRFD)
Role: Main Contractor

Project Duration:
From: 14 Feb 2008
To: 30 Jun 2008

Total Contract Value:
AED 153,000,000.00

Project Description

Hard Landscape Works

  • Paving of Pre-cast concrete tiles
  • Furniture and fittings
  • Timber board walk
  • Concrete plaza flooring, concrete steps and Landscape wall
  • Children’s play area

Soft Landscape Works

  • Planting of Palms, shrubs & ground covers including backfilling
  • Maintenance and after care 360 days

Irrigation Works

  • Automatic Irrigation networks
  • Maintenance and after care 360 days
  • Irrigation mainline, sub-mainline and lateral

Building Works

  • Toilets at beach 7 Nos.
  • Beach Towers 7 Nos.
  • Kiosk at Corniche galleria 2 Nos.
  • Toilets at Corniche Galleria 2 nos.
  • Prayer room at Corniche Galleria 1 No.
  • Maintenance room/ garbage room 1 no.
  • Supply and installation of cables
  • Supply and installation of Portable Water system
  • Supply and installation of Drainage system Building

Electrical Works

  • Supply and installation of Landscape lights
  • Umbrella lights 170 nos.
  • Up lights to palms 300 Nos.
  • Runway Lights to Board walk 1000 Nos.
  • Bollard Lights 1000 nos.
  • Supply and installation of complete electrical system

Infrastructure Works

  • Storm water pipeline works – Sewerage pipeline works – 7nos. out falls connecting to new line.
  • Underground Pumping station – 2Nos.
  • Construction of Manholes – Odour chamber – MCC room – Inlet