Abu Dhabi Corniche Swimming Beach
Client: Abu Dhabi Municipality (PRFD)
Role: Main Contractor
Project Duration:
From: 14 Feb 2008
To: 30 Jun 2008
Total Contract Value:
AED 153,000,000.00
Project Description
Hard Landscape Works
- Paving of Pre-cast concrete tiles
- Furniture and fittings
- Timber board walk
- Concrete plaza flooring, concrete steps and Landscape wall
- Children’s play area
Soft Landscape Works
- Planting of Palms, shrubs & ground covers including backfilling
- Maintenance and after care 360 days
Irrigation Works
- Automatic Irrigation networks
- Maintenance and after care 360 days
- Irrigation mainline, sub-mainline and lateral
Building Works
- Toilets at beach 7 Nos.
- Beach Towers 7 Nos.
- Kiosk at Corniche galleria 2 Nos.
- Toilets at Corniche Galleria 2 nos.
- Prayer room at Corniche Galleria 1 No.
- Maintenance room/ garbage room 1 no.
- Supply and installation of cables
- Supply and installation of Portable Water system
- Supply and installation of Drainage system Building
Electrical Works
- Supply and installation of Landscape lights
- Umbrella lights 170 nos.
- Up lights to palms 300 Nos.
- Runway Lights to Board walk 1000 Nos.
- Bollard Lights 1000 nos.
- Supply and installation of complete electrical system
Infrastructure Works
- Storm water pipeline works – Sewerage pipeline works – 7nos. out falls connecting to new line.
- Underground Pumping station – 2Nos.
- Construction of Manholes – Odour chamber – MCC room – Inlet