PRFD Contract – 482
Client: Abu Dhabi Municipality (PRFD)
Role: Main Contractor
Project Duration:
From: 25/12/2007
To: 16/03/2010
Total Contract Value:
AED 33,947,034.61
Project Description
Agriculture Drainage Works for Forest Green Belt at Al Jarf Area, Phase 1
Project Features:
- General works
- Site works
- Subsoil Water, Pipelines
- Subsoil water, Structures
- Pressure Pipelines
- Subsoil Water Pumping Station (Civil)
- Subsoil Water Pumping Station (Mechanical)
- NDM works
Scope of Works:
- Subsoil (solid or slotted) drainage including related structures and associated works.
- Construct of Pumping Stations, Generator building and Motor Control Panels including all Civil and Mechanical/Electrical Works.
- Pressure Pipelines including related structures, valve chambers and associated works.
- Connection of new storm water and subsoil lines to existing networks.
- Works related to abandonment of existing storm water and subsoil lines including related structures
- Cleaning and flashing of existing storm water and subsoil lines and its related structures
- NDM works.
- Any works related to the above works in any location within project Areas, which may be instructed throughout the duration of the Contract.
- Reinstatement of all surfaces and/or any existing components/services distributed or damaged as a result of the construction of this project.
- Any other works related to the above works in any location within 50 km of Project Areas, which may be instructed throughout the duration of the Contract.
- The provision of labour, material, plant, equipment, instrument etc. required for the works.
- The testing and commissioning of all works.
- The maintenance of the works for a period of 365 days.