T10/2018; Phase-1 Civil & Miscellaneous Works All Fabric Shade Structures Works
Client: Al Ain Zoo
Role: Main Contractor
Project Duration:
From: 06/01/2019
To: 06/06/2019
Total Contract Value:
AED 2,994,569.33
Project Description
Supply and installation of Tensile Shade Fabric Structures in different locations of Al Ain Zoo. Design and Built of Tensile Shade Fabric Structures in different locations in Al Ain Zoo.
- Supply and install Shade Fabric Structures at Children Discovery Area at Kid’s Demonstration area.
- Extend the existing shade structure to cover the back side of corridor in Animal Contact Barn (rear side) at CDA
- Install new shade structure in the service yard to serve as storage for dry grass and husbandry tools at Dog & Hyena holding building yard. (OGW)
- Fabricate and install new shade structures at the entrance of the Cheetah BOH building. (AMP)
- Fabricate and install Al Ain Safari Shading for Safari Cars. (PSE)
- Supply and Install Fabric shade structure over Vervet and Monkey Enclose